Bloom & Buzz Custom Sawn Lumber What are you looking for?Choose a project typeStandard boardsWide slab / tabletopBookmatched pairMantelPostBeamShelvingTurning / project blankSomething else WoodChoose a woodBlack Walnut · AskEastern Red Cedar · YesRed Oak · AskSweetgum · AskTulip Poplar · AskWhite Oak · Ask Not sure which wood to choose?Select a wood you like, or use your project description to tell us what matters most. Availability is confirmed during review. How would you like the lumber supplied? Rough sawn Planed to thickness Jointed + planed I'm not sure What do these preparation choices mean?Rough sawn keeps the mill-sawn surface. Planed to thickness makes thickness more consistent where material fits our planer. Jointed + planed adds a flattened reference face/edge where the piece fits our jointer. If you only know the finished size you need, choose “I'm not sure” and describe the project. Thickness4/4 · about 1 in rough5/4 · about 1¼ in rough6/4 · about 1½ in rough8/4 · about 2 in rough10/4 · about 2½ in rough12/4 · about 3 in roughI'm not sureWhat does 8/4 mean?Rough lumber thickness is often described in quarters of an inch. 4/4 is about 1 inch rough; 6/4 about 1½ inches; 8/4 about 2 inches. You do not need to know this terminology to submit a request.Width or depth (in)Length (ft)QuantityAdd this size Request total0 board feetWhat's a board foot?A board foot measures lumber volume. You do not need to calculate it; this calculator does it for you.Add at least one size to evaluate the request. Edge preferenceRough edgedLive edgeEitherI'm not sureWhat's a live edge?The natural outer edge of the tree remains on one or both sides instead of being cut straight. Drying requirementGreenAir driedReady for indoor use where availableI'm not sureWhat does air dried mean?Lumber is dried gradually with airflow rather than used fresh from the mill. Final suitability depends on moisture and intended use. What are you making?Anything else we should know? Custom jobs require a non-refundable percentage deposit after quote acceptance.We first confirm suitable logs, feasibility, preparation, final pricing, and the deposit amount. Paying the deposit commits material and a production slot to your job. Submit for Quote